BOOK NOW for our Santa Specials - Click here for more info!

Autumn's rail-cleaner calls at the Junction

Published: 24/10/2026

Autumn's rail-cleaner calls at the Junction

Credit: Jl


A Network Rail railhead treatment unit, DR98927, was photographed at Yeovil Junction last Saturday. Here's what it is and why it was here.
Yeovil Railway Centre news desk, November 2026. Photo: reader submission.
Caption: DR98927 at Yeovil Junction on Saturday 31 October 2026. The cab carries Network Rail's "clearing Britain's railways" livery, now well coated in autumn grime.
Visitors to the Junction last weekend may have spotted something unusual beside the platform: a mud-streaked yellow and green vehicle with Network Rail branding. We don't often see these in daylight, so we asked a reader for their photo and had a closer look.
What is DR98927?
DR98927 is a Network Rail multi-purpose vehicle (MPV) from the DR989xx series, built by Schweerbau of Germany. It is paired with DR98977 at the other end of the set. The MPVs are built as a set: a driving cab at each end with tank and equipment modules between. What our reader photographed is one end of that longer formation, which explains the big tanks stretching away behind the cab.
Why does the railway need it?
When leaves fall onto the rails and get crushed by passing trains, they bake into a thin, slippery film. Drivers call it "black ice" for good reason: wheels lose grip, trains slide past braking points, and track circuits can struggle to detect a train at all.
Railhead treatment units tackle it in two steps:
Jet. High-pressure water blasts the film off the top of the rail.
Treat. A sand-and-grit gel is laid on the clean rail to restore grip for the trains that follow.
The foggy, damp morning in the photo is exactly the weather that makes the problem worst.
Why Yeovil?
The south-west is a regular treatment area from October to December, and the lines through Yeovil are part of the autumn programme. Past reports place DR98977 and DR98927 on a treatment working from Totton via Honiton, a route that passes close to us, so seeing this pair here is not a surprise.
These trains usually run through the night and early morning on their own timetabled paths, so catching one standing at a station in daylight is a bit of luck.
What we don't know yet
We haven't been able to confirm the exact working or headcode for last Saturday's move. If you were at the Junction that day and know more, we'd like to hear it.
Want to track the next one?
Search Realtime Trains for Yeovil Junction on the date you're interested in, and look for an unadvertised "3S" or "3Z" headcode described as a railhead treatment train.
Check the Taunton Trains workings log and Traksy, where enthusiasts post daily sightings.
Autumn treatment runs through to December, so there are still plenty of chances.
Yeovil Railway Centre is based at Yeovil Junction station. Check our main website for running days and visiting information before you travel.